Stamping
Jewellery - The Jewellery which is made from sheet metal
is called stamped jewellery. This jewellery is of light weight
and has good value for money.
Lead
Period for the delivery of Stock - The lead period depends
upon article.
a)
If the article is from the existing stock the lead period
is 30-45 days from the receipt of order or advance or the
letter of credit.
b)
If the article is to be made for the first time, the lead
period is 2 months because it involves making of die
and tooling and the approval of samples prior to the manufacture
of jewellery.
Minimum Order Quantity
- the minimum order quantity is based on selection of design.
If it is a new product than the quantity is decided based
on the cost of die and tooling.
Details
about the development and designing of the first lot -
The new product from the drawing stage is converted to solid
sample by master goldsmiths, subsequently the die and tooling
is made and prototype samples are made. These samples are
sent to the customer for approval before the commencement
of production
Details
about the Quality Inspection and Certification - The factory
runs on the principle of total quality management, wherein
each department is responsible for its own quality standard
as set by the quality control head. However the final
quality is certified by the final quality inspection department,
before packing and dispatch.